Use original manufacturing knowledge
Suitable when your workshop can manufacture a component efficiently from the original data and established standards.
The optimal solution may be manufactured in China, executed in Spain or divided between both workshops. SLTP helps the manufacturer compare those routes using technical risk, lead time and total delivered cost.
Send your support scenarioA replacement insert may be economical to manufacture in China but still require fitting, adjustment and injection validation in Spain. A welded correction may be faster locally. The right answer depends on the actual case.
Suitable when your workshop can manufacture a component efficiently from the original data and established standards.
Suitable for urgent inspection, welding, machining, adjustment, try-out or validation when local execution reduces overall delay.
Your team manufactures; ITM receives, fits, adjusts and validates locally under the approved technical route.
Original design knowledge, repair feasibility, tolerance, fitting, validation needs and consequences of failure.
Manufacturing time, transport, customs, plant access, local capacity and production urgency.
Engineering, manufacturing, logistics, fitting, try-out, travel and the cost of production delay.
Issue, drawings, history, location and timing.
Condition and technical constraints reviewed.
China, Spain and hybrid options evaluated.
Manufacturer confirms scope and cost.
Both teams complete and document their tasks.
Hybrid thinking is not reserved for the highest service level. The commercial difference is how the diagnostic and engineering work is charged.
Yes. Diagnosis, engineering study and preparation of the proposal are billed by the hour.
The diagnostic report and technical proposal can be included within the agreed service fee. Execution costs remain separately scoped and approved.
The approved route defines responsibilities case by case. The component may be manufactured by your team in China or locally when appropriate.
The Chinese manufacturer controls the communication workflow. ITM participates only under the agreed authorization.
Your team and ITM will compare the feasible routes before corrective work is authorized.